Double Eagle Photos 
Page 5
Here is the aft ramp/steps. It is cantilevered out from the aft bulkhead and covers the outboard. The top level deck panel will raise to allow top down access to the outboard.
email me

This is the raised portion of the cabin top over the aft entry.
The roof deck is on and you can see the top of the wheelhouse forward. The horizintal beam is temporary scaffolding.
The wheelhouse is finally in place along with most of the foredeck.
Another view of the wheelhouse.
This photo was taken some time later than the ones above. It shows the beam that spans the full width of the boat. A slatted backrest will go on the forward side. The opening is for ground tackle.
Another view of the beam.
The exterior except for windows and paint is finally almost done. There is no more major construction on the outside.